Introduction
Innova Renewables is preparing a planning application for the proposed solar farm at the former Desborough Airfield, Kettering.
The site would be capable of generating up to 99.9 megawatts (MW) of renewable energy, enough to power approximately 32,000 homes, while saving around 18,750 tonnes of CO₂ emissions annually, and would also include up to 100 MW of energy storage capacity.
Innova is currently preparing details that will form part of the public consultation, which will take place prior to the submission of the full planning application.